noCV
AARCHIVE-106 · Model archive boundaries

Authorize archive retrieval before issuing object capabilities

Practice briefTaskExpert

An audit search hit contains a raw object key; clients can request other tenants' segments by changing that key.

Focused work estimate
5h + prerequisites
Priority in the scenario
High
Engineering practice
Authorization architecture · Data isolation

Estimated field mix

  • Security50%
  • System design30%
  • Storage systems20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional procurement platform keeps append-only action records. Operators want fast recent search and affordable old records without losing provenance or leaking tenant data.

Setup prerequisites

  • Create synthetic audit events and local storage/search adapters.
  • Use an explicit fictional retention policy, not legal advice.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Resolve event and segment within the caller's authorized tenant.
  • Issue a capability scoped to the exact object version.
  • Avoid exposing neighboring events through shared-segment retrieval.

Implementation constraints

  • Choose per-tenant segments or a server-side filtered retrieval contract.

Verification to include

  • Retrieve a permitted synthetic event through the chosen boundary.
  • Alter tenant or segment identity and verify no capability is issued.

Deliverables

  • Archive access contract and cross-tenant probe

Rollout and recovery

Keep raw objects private; enable retrieval only after the projection isolation checks pass.

Value of the work

For the engineer: Practice storage tradeoffs, provenance and data-lifecycle decisions.

For the team: Review archive cost and retrieval guarantees before committing to infrastructure.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.