noCV
ABATCH-101 · Define independent check facts

Freeze the required check set when a document review run starts

Practice briefTaskFoundational

A configuration change adds a checker while a run is in progress, so the completion predicate changes halfway through.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Immutability · Workflow contracts

Estimated field mix

  • Distributed systems60%
  • Backend40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional vendor portal runs format, policy and duplicate checks in parallel. A slow checker blocks completion, while duplicate callbacks can produce contradictory final summaries.

Setup prerequisites

  • Create synthetic document identities and three fake check providers.
  • No real risk scoring, hiring decisions or candidate execution is included.

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Record exact checker identities and versions per run.
  • Bind the set to immutable document input identity.
  • New configuration affects only new runs.

Implementation constraints

  • Use three deterministic fake checks with no capability scoring.

Verification to include

  • Start runs before and after a check-set change.
  • Finish the older run using its original required set.

Deliverables

  • Review-run manifest

Rollout and recovery

Publish frozen manifests before parallel dispatch; retain prior checker versions for replay.

Value of the work

For the engineer: Practice fan-out/fan-in, deadline policies and immutable aggregation.

For the team: Review trustworthy partial-result handling and controllable parallel work.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.