noCV
AIMAGE-106 · Promote exact artifacts

Stop promotion when required security scan results are missing

Practice briefTaskAdvanced

A scan service times out and the build pipeline treats absence of findings as a clean result.

Focused work estimate
3h + prerequisites
Priority in the scenario
Medium
Engineering practice
Fail-closed gates · Supply-chain checks

Estimated field mix

  • Security60%
  • Platform engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional reporting API is rebuilt separately for staging and production. Different dependency resolutions and mutable tags make incident rollback unreliable.

Setup prerequisites

  • Create a tiny local HTTP service and nonprivileged image build.
  • Use synthetic registries or provider fixtures; no production deployment.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Represent passed, failed and unavailable scan states distinctly.
  • Require scan policy and artifact digest to match.
  • Unavailable required results block promotion with a retry path.

Implementation constraints

  • Use synthetic scan responses; do not claim current vulnerability coverage.

Verification to include

  • Promote with matching passed policy results.
  • Timeout or return a different digest and verify promotion remains blocked.

Deliverables

  • Scan-result gate and unavailable-state tests

Rollout and recovery

Run the gate before environment selection; retry scans without rebuilding the artifact.

Value of the work

For the engineer: Practice artifact identity, least privilege and reproducible delivery.

For the team: Review whether deployed bytes can be traced and rolled back reliably.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.