noCV
AINGEST-105 · Load traceable records

Quarantine malformed readings with usable row coordinates

Practice briefStoryFoundational

A malformed timestamp makes the ingestion job fail with a stack trace and no indication of the source row.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Data quality · Error reporting

Estimated field mix

  • Data engineering100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional energy dashboard receives hourly device batches. Corrupt archives and late corrections leave operators unsure which readings reached reports.

Setup prerequisites

  • Create synthetic device batches and local object-store fixtures.
  • Understand checksums and bounded streaming.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Report manifest ID, row number and stable reason code.
  • Keep rejected values out of generic logs.
  • Publish accepted and rejected counts under the declared partial-load policy.

Implementation constraints

  • Choose and document all-or-nothing versus row quarantine for this dataset.

Verification to include

  • Load a batch containing valid rows under the chosen policy.
  • Insert malformed timestamps and verify coordinates and count invariants.

Deliverables

  • Quarantine report and policy tests

Rollout and recovery

Enable reports before changing load policy; replay corrected manifests as new attempts.

Value of the work

For the engineer: Practice batch integrity, replay and data-quality boundaries.

For the team: Review whether operational data can be traced, corrected and recovered.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.