Resolve an inspection conflict against its current proposal set

Practice briefStoryIntermediate

A reviewer resolves a conflict while a third offline proposal arrives, silently discarding the new observation.

Focused work estimate
3h + prerequisites
Priority in the scenario
Medium
Engineering practice
Optimistic concurrency · Auditability

Estimated field mix

  • Distributed systems50%
  • Database engineering30%
  • Backend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional field team inspects equipment with intermittent connectivity. Two tablets can edit the same checklist and an old upload may restore a deleted finding.

Setup prerequisites

  • Create two local client-state simulators and a synthetic inspection API.
  • Use fabricated notes and local attachment bytes.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Bind resolution to the expected conflict revision and proposal identities.
  • Record resolution as an append-only fact.
  • Reject stale resolution without deleting proposals.

Implementation constraints

  • Require the reviewer's current inspection permission.

Verification to include

  • Resolve an unchanged two-proposal conflict.
  • Add a third proposal before commit and verify stale resolution conflicts.

Deliverables

  • Guarded conflict resolution command

Rollout and recovery

Canary synthetic review; reopen by appending a new conflict fact rather than editing history.

Value of the work

For the engineer: Practice offline synchronization, causal revisions and conflict resolution.

For the team: Review whether field work survives disconnection without hiding conflicting observations.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.