Application checks pass, but a direct import can still create a case with an absent new customer identity.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Constraint validation · Migration operations

Estimated field mix

  • Database engineering100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional support platform stores a mutable external account code as its primary relationship key. Renames and imports now break references in several tables.

Setup prerequisites

  • Create a disposable database with synthetic customers and dependent records.
  • Apply real migration files; never use production db push.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Add or validate foreign-key and non-null constraints after readiness.
  • Document database lock expectations for each migration step.
  • Reject writes violating the new relationship invariant.

Implementation constraints

  • Use PostgreSQL-supported staged validation where appropriate; inspect actual SQL.

Verification to include

  • Apply the constraint migration after a clean backfill.
  • Attempt orphan and null references through direct SQL and observe rejection.

Deliverables

  • Constraint migration and direct-write checks

Rollout and recovery

Apply in a controlled synthetic window; abort on lock contention and preserve the bridge schema.

Value of the work

For the engineer: Practice migration ordering, compatibility and referential integrity.

For the team: Review a reversible schema transition with measurable completeness checks.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.