noCV
ANOTIFY-103 · Define communication intent

Choose when notification preferences are evaluated

Practice briefTaskFoundational

A user opts out after an event is queued but still receives the email, and the team has no documented policy.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Tradeoff analysis · Preference design

Estimated field mix

  • System design50%
  • Privacy engineering30%
  • Backend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional collaboration tool sends email and in-app notifications. Duplicate alerts and preference changes reveal that the design has no single definition of delivery.

Setup prerequisites

  • Create synthetic recipients, events and fake delivery providers.
  • Do not send real email or messages.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Compare preference-at-intent and preference-at-send semantics.
  • Choose and document behavior for opt-out and critical notices.
  • Define how a changed preference version affects queued work.

Implementation constraints

  • Do not silently invent a legal or mandatory-notice requirement.

Verification to include

  • Trace an opt-out between event and send.
  • Trace a missing preference record under the declared default policy.

Deliverables

  • Preference-timing architecture decision

Rollout and recovery

Review with product before adapter work; keep unresolved categories unsent.

Value of the work

For the engineer: Practice asynchronous contracts, preference timing and delivery uncertainty.

For the team: Review a notification design that controls nuisance, disclosure and recovery.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.