noCV
BAPIBULK-101 · Define operation resources

Define the difference between accepted and completed bulk work

Practice briefTaskFoundational

The current endpoint returns success before any imported row has been validated.

Focused work estimate
1h + prerequisites
Priority in the scenario
Medium
Engineering practice
API modeling

Estimated field mix

  • API design80%
  • Backend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional catalog API needs to accept imports too large for one synchronous request. Partners need to distinguish accepted work, completed items, and recoverable failures.

Setup prerequisites

  • Create a local API and worker double with synthetic catalog records and controlled interruption points.

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Publish accepted, running, completed, and failed meanings.
  • Define terminal partial-success representation.
  • Keep transport acceptance separate from item validity.

Implementation constraints

  • Use explicit operation transition methods.

Verification to include

  • Represent an accepted unprocessed import.
  • Show completed-with-errors without claiming every item succeeded.

Deliverables

  • Bulk operation schema.

Rollout and recovery

Review lifecycle vocabulary before adding endpoints.

Value of the work

For the engineer: Practice asynchronous resource contracts, partial outcomes, and idempotent operations.

For the team: Provide predictable bulk integration behavior without ambiguous success or repeated effects.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.