noCV
BAPIHOOK-101 · Define public events

Define immutable webhook envelopes independently of database rows

Practice briefTaskFoundational

Event payloads mirror internal shipment rows and change whenever the schema changes.

Focused work estimate
1h + prerequisites
Priority in the scenario
Medium
Engineering practice
Event API design

Estimated field mix

  • API design80%
  • Data engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional logistics platform sends shipment events to partner endpoints. Partners need stable schemas and recovery semantics despite duplicate delivery, failures, and subscription changes.

Setup prerequisites

  • Create a local webhook sender and receiver doubles with synthetic shipment events and disposable signing keys.

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Publish event ID, type, version, and occurrence time.
  • Use a deliberate public payload projection.
  • Preserve emitted event bytes or canonical content identity.

Implementation constraints

  • Exclude internal fields and hidden operational metadata.

Verification to include

  • Create a documented shipment event.
  • Change an internal-only field without altering the public contract.

Deliverables

  • Webhook envelope schema.

Rollout and recovery

Version public payloads before accepting subscriptions.

Value of the work

For the engineer: Practice public event contracts, delivery guarantees, and partner recovery workflows.

For the team: Provide inspectable asynchronous integration behavior with controlled retries and clear compatibility.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.