noCV
BAPIVER-101 · Design version semantics

Inventory breaking and additive availability-contract changes

Practice briefTaskFoundational

The proposed response renames fields and changes unknown stock from null to zero.

Focused work estimate
1h + prerequisites
Priority in the scenario
Medium
Engineering practice
API compatibility

Estimated field mix

  • API design100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Classify each request and response change.
  • Preserve unknown versus zero semantics.
  • Identify supported legacy behavior explicitly.

Implementation constraints

  • Use actual local contract examples rather than general compatibility slogans.

Verification to include

  • Classify an optional additive field.
  • Flag a meaning-changing null-to-zero conversion.

Deliverables

  • Contract change inventory.

Rollout and recovery

Review the inventory before choosing a versioning approach.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.