BMONO-104 · Build the planner

Resolve renamed and deleted files against both revisions

Practice briefBugAdvanced

A package deletion disappears from the current workspace map and incorrectly produces an empty plan.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Git · Change analysis

Estimated field mix

  • Developer tooling100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional internal tools team maintains eighteen packages. Engineers currently run everything because the affected-package script occasionally misses downstream consumers.

Setup prerequisites

  • Create a local six-package fixture with a dependency cycle, shared compiler configuration, and two example changes.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Read changed paths from a declared base and head.
  • Account for both source and destination of renames.
  • Select former dependents when a package is removed.

Implementation constraints

  • Do not assume a remote branch exists in a shallow checkout.

Verification to include

  • Plan a package move with unchanged contents.
  • Exercise missing base and deleted-manifest cases with explicit fallback.

Deliverables

  • Revision-aware path ownership logic.

Rollout and recovery

Ship behind diagnostic output; preserve full CI for unresolved history.

Value of the work

For the engineer: Practice graph analysis, reproducible commands, and safe developer-tool failure modes.

For the team: Produce an inspectable CI selection plan that avoids unnecessary work without silently skipping consumers.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.