noCV
BPROXY-106 · Manage connections

Propagate downstream disconnects through streamed responses

Practice briefBugAdvanced

A cancelled report download continues consuming upstream bandwidth.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Streams · Cancellation

Estimated field mix

  • Networking50%
  • Backend30%
  • Performance engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional reporting API sits behind a reverse proxy. Clients see intermittent disconnects and incorrect origins after changes to keep-alive and forwarding headers.

Setup prerequisites

  • Create two loopback HTTP services and a local proxy with synthetic requests; no public scanning or external traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Abort the owned upstream request on disconnect.
  • Stop buffering and release stream resources.
  • Preserve completion metrics distinct from cancellation.

Implementation constraints

  • Use bounded synthetic report streams.

Verification to include

  • Finish a small streamed response.
  • Disconnect mid-stream and verify upstream cancellation.

Deliverables

  • Streaming cancellation fix.

Rollout and recovery

Adopt on one streaming route; retain traces of safe lifecycle events.

Value of the work

For the engineer: Practice HTTP intermediaries, connection lifetimes, and network failure isolation.

For the team: Provide a proxy contract that preserves request identity and releases resources predictably.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.