noCV
BSDKGEN-108 · Verify packages

Make generated examples compile against their advertised version

Practice briefChoreFoundational

Documentation snippets refer to methods removed two releases ago.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Documentation · TypeScript

Estimated field mix

  • Developer tooling80%
  • Quality engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional partner platform publishes TypeScript clients. Generator upgrades create noisy diffs, occasional runtime mismatches, and uncertainty about which schema was packaged.

Setup prerequisites

  • Create a small public API schema and two local mock server versions; use a temporary local package registry or archive files.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Compile examples using the packaged client.
  • Pin examples to a release identifier.
  • Show credential placeholders without usable secrets.

Implementation constraints

  • Examples must call the local mock service only.

Verification to include

  • Run the basic read and paginated examples.
  • Detect a snippet using a removed method.

Deliverables

  • Executable example suite.

Rollout and recovery

Update examples together with packages; retain versioned previous examples.

Value of the work

For the engineer: Practice reproducible generation, compatibility reviews, and package provenance.

For the team: Reduce partner integration surprises with reviewable clients and recoverable releases.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.