- Project scope
- 10 tickets / 3 phases
- Total focused work estimate
- 26h 30m + setup
- Suggested stack
- TypeScript · Prometheus · HTTP
Recommended next stepStart with BSLO-101
Open the first ticket for its prerequisites, acceptance criteria, verification plan, and an editable task draft.
What the engineer takes away
Practice SLI semantics, alert evaluation, and reliability tradeoffs.
What the team gains
Align reliability discussions with customer outcomes and explicit measurement limits.
Before you start
- Create synthetic request and order-event traces plus a local query or metrics fixture; no production telemetry required.
Delivery agreement
Deliver executable indicator queries, alert fixtures, and an SLO decision record.
AI tools are welcome during implementation. Record assumptions, review the result, and verify its behavior.
Delivery phases
- PHASE 1
Specify measurable user outcomes and valid denominators.
- PHASE 2
Handle missing data and evaluate budget burn.
- PHASE 3
Connect reliability policy to reviewable operational decisions.
Define indicators
Specify measurable user outcomes and valid denominators.
BSLO-101Entry ticket; project setup still required BSLO-102Depends on BSLO-101Estimated field mix
- Site reliability60%
- Data engineering40%
Compute and alert
Handle missing data and evaluate budget burn.
BSLO-103Depends on BSLO-102Estimated field mix
- Site reliability60%
- Data engineering40%
BSLO-104Depends on BSLO-103Estimated field mix
- Site reliability80%
- Frontend20%
BSLO-105Depends on BSLO-102, BSLO-104Estimated field mix
- Site reliability70%
- Data engineering30%
BSLO-106Depends on BSLO-105Estimated field mix
- Site reliability80%
- System design20%
Use the objective
Connect reliability policy to reviewable operational decisions.
BSLO-107Depends on BSLO-105, BSLO-106Estimated field mix
- Site reliability80%
- System design20%
BSLO-108Depends on BSLO-106Estimated field mix
- Site reliability50%
- Frontend30%
- Privacy engineering20%
BSLO-109Depends on BSLO-107, BSLO-108Estimated field mix
- Site reliability70%
- Data engineering30%
BSLO-110Depends on BSLO-109
Use this project
CSV keeps grouping and dependency keys as descriptive fields. Import mapping depends on your tracker configuration.