noCV
BTEST-106 · Remove nondeterminism

Find async work that escapes test teardown

Practice briefBugAdvanced

Background polling continues after a test completes and changes the next test's state.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Resource lifecycle · Testing

Estimated field mix

  • Quality engineering80%
  • Developer tooling20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional web team reruns red builds until they pass. Shared clocks, leaked state, and unawaited work make failures hard to trust.

Setup prerequisites

  • Create a small local application with three deliberately flaky tests using synthetic data and local endpoints.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Track owned timers, subscriptions, and requests.
  • Cancel owned work during teardown.
  • Fail the test on unhandled late rejections.

Implementation constraints

  • Do not suppress process-level rejection reporting.

Verification to include

  • Complete a polling test with clean teardown.
  • Inject an ignored cancellation and detect the leaked work.

Deliverables

  • Async lifecycle repair.

Rollout and recovery

Enable leak detection for the affected suite before expanding coverage.

Value of the work

For the engineer: Practice controlled diagnosis, isolation, and test reliability measurement.

For the team: Recover useful failure signals and reduce blind reruns without hiding product defects.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.