noCV
BTRIAGE-105 · Build draft assistance

Require source references for incident summary statements

Practice briefTaskAdvanced

The generated summary invents a deployment that never happened.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Grounding · Schema validation

Estimated field mix

  • Applied AI80%
  • Site reliability20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional on-call team wants an assistant that joins alerts, deployment notes, and runbooks. Incomplete telemetry and hostile log content make unsupported conclusions dangerous.

Setup prerequisites

  • Author synthetic alerts, deployment records, and runbooks plus deterministic tool and model doubles.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Bind factual statements to retrieved source identities.
  • Reject nonexistent and unauthorized references.
  • Separate observations from hypotheses.

Implementation constraints

  • Use AiEvaluationProvider and schema-validated structured responses.

Verification to include

  • Accept a source-backed timeline statement.
  • Reject invented deployments and uncited root-cause assertions.

Deliverables

  • Summary validator.

Rollout and recovery

Render only validated drafts; return unavailable on invalid output.

Value of the work

For the engineer: Practice constrained tool use, operational uncertainty, and traceable AI outputs.

For the team: Produce concise incident drafts that preserve source traceability and operator control.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.