BUILD-101 · Model checks and dependencies

Reject invalid task configuration before starting a command

Practice briefTaskFoundational

A misspelled dependsOn entry silently removed a typecheck prerequisite. Introduce a validated task configuration with clear locations for configuration errors.

Focused work estimate
1h + prerequisites
Priority in the scenario
Medium
Engineering practice
Schema validation · CLI design · Path safety

Estimated field mix

  • Developer tooling80%
  • Security20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A product team waits for every package to rebuild after small changes. An experimental cache is faster but occasionally returns success after a shared type changed. Build a small, auditable task runner around fixture packages.

Setup prerequisites

  • Prepare four fixture packages with one shared library and two applications.
  • Use only trusted fixture commands in local tests.

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Every task has a unique ID, command argument list, working directory, and declared dependencies.
  • Unknown dependencies and paths outside the workspace fail validation.
  • Validation reports all independent configuration errors without starting commands.

Implementation constraints

  • Commands are trusted fixture configuration; no shell interpolation.
  • Keep configuration parsing independent of execution.

Verification to include

  • Validate a four-task graph successfully.
  • Submit a missing dependency and escaping working directory together and confirm both errors and zero process starts.

Deliverables

  • Configuration schema and validation diagnostics

Rollout and recovery

Use validation in a read-only plan command first; refuse execution for older unsupported config versions.

Value of the work

For the engineer: Practice incremental computation, dependency scheduling, cache correctness, and cancellation.

For the team: Inspect whether faster checks preserve the guarantees reviewers depend on.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.