noCV
CBLOB-109 · Operate retention

Protect retained document versions from blob cleanup

Practice briefBugAdvanced

Cleanup counts only current document references and breaks retained versions. Include every retained reference authority.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Retention · Data modeling

Estimated field mix

  • Storage systems60%
  • Database engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional archive Moss deduplicates generated attachments across documents within each organization. Use local files and transactional metadata stubs.

Setup prerequisites

  • Generate duplicate and unique local byte fixtures.
  • Create synthetic document references across two organizations.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Retained versions preserve blobs
  • Expired versions release references
  • Cross-tenant records cannot affect counts

Implementation constraints

  • Retention policy is a fixture contract, not a legal claim.

Verification to include

  • Retain old version
  • Expire it and inspect eligibility

Deliverables

  • Version-aware reference accounting

Rollout and recovery

Pause cleanup until all reference sources reconcile.

Value of the work

For the engineer: Practice reclamation races and explicit data-lifecycle guarantees.

For the team: Inspect whether storage cleanup avoids broken references and hidden retention.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.