Restore staffing focus after a shift is deleted
Deleting a selected block sends focus to the document body. Choose a predictable surviving target.
- Focused work estimate
- 2h 45m + prerequisites
- Priority in the scenario
- High
- Engineering practice
- Focus management · Async UI
Estimated field mix
- Accessibility70%
- Frontend30%
Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.
Review it, then add it to your workspace.
The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.
Project context
Fictional studio Loom assigns editorial shifts. Build synthetic shifts and a local scheduling adapter; no real staff records are used.
Setup prerequisites
- Create synthetic shifts including overlaps and daylight-saving boundaries.
- Implement a local schedule revision adapter.
Preceding work
Complete these dependencies, or supply their agreed outputs before taking this ticket.
Acceptance criteria
- Next chronological shift receives focus
- Empty day focuses its heading control
- Failed deletion retains original focus
Implementation constraints
- Resolve targets after committed DOM updates.
Verification to include
- Delete middle shift
- Reject deletion and inspect focus
Deliverables
- Focus resolver and deletion checks
Rollout and recovery
Keep deleted-row placeholder temporarily if focus restoration fails.
Value of the work
For the engineer: Practice focus models and accessible alternatives for spatial interfaces.
For the team: Inspect whether scheduling remains usable across input methods and failure states.
Evidence boundaries
Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.
Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.