noCV
CCONFIG-102 · Specify configuration contracts

Keep desired and reported edge configuration separate

Practice briefBugFoundational

Sending a setting immediately changes the dashboard to Applied before the gateway responds. Store separate desired and reported revisions.

Focused work estimate
1h 15m + prerequisites
Priority in the scenario
Medium
Engineering practice
State modeling · Observability

Estimated field mix

  • Embedded and edge50%
  • Distributed systems30%
  • Frontend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information-display gateways receive brightness schedules and cache limits. These settings affect only a software display emulator; no real devices, safety controls or customer data are used.

Setup prerequisites

  • Define synthetic configuration schema and supported device capabilities.
  • Implement local control-plane and gateway adapters with delayed messages.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Sending changes desired state
  • Acknowledgement changes reported state
  • Mismatch appears as pending drift

Implementation constraints

  • Delivery is not application acknowledgement.

Verification to include

  • Send then acknowledge
  • Drop delivery and inspect drift

Deliverables

  • State model and projection cases

Rollout and recovery

Stop displaying Applied when acknowledgement is absent.

Value of the work

For the engineer: Practice desired/reported state, compatibility and rollback.

For the team: Inspect whether remote configuration preserves working settings through offline and partial outcomes.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.