noCV
CDOWN-107 · Handle transfer boundaries

Recover a course-download rename interrupted by process death

Practice briefBugExpert

A crash between verification and final rename leaves duplicate shelf entries. Introduce a recoverable promotion record.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Crash consistency · Transactions

Estimated field mix

  • Storage systems50%
  • Mobile30%
  • Database engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional learning app Birch offers synthetic text and small local media fixtures through a loopback adapter. No copyrighted course assets or network accounts are needed.

Setup prerequisites

  • Create small local byte fixtures and a range-response stub.
  • Simulate low storage, interruptions and stale manifests.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Recovery identifies one installed version
  • Unverified partials stay hidden
  • Repeated recovery is idempotent

Implementation constraints

  • Keep metadata and file promotion reconciliation explicit.

Verification to include

  • Kill at each promotion boundary
  • Repeat recovery after missing temp file

Deliverables

  • Promotion journal and crash cases

Rollout and recovery

Disable promotion and retain recoverable temporary files.

Value of the work

For the engineer: Practice mobile file lifecycles and background state recovery.

For the team: Inspect predictable resource usage and truthful download status.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.