CLI-104 · Prepare a reviewable release

Make a dirty checkout a deliberate release decision

Practice briefBugIntermediate

A teammate prepared a release with an uncommitted dependency change and could not reproduce the resulting versions. Capture the base revision and refuse preparation when tracked files differ.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Git · Integrity checks · Failure handling

Estimated field mix

  • Developer tooling100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A team maintains six related packages. Release notes, version changes, and tags are copied between a spreadsheet and a terminal; a failed upload recently left two packages ahead of their dependents. The exercise uses temporary repositories and a fake registry.

Setup prerequisites

  • Create a temporary Git repository with three related fixture packages.
  • Use a local registry double; no publishing credentials are required.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • The plan records the full base commit and a digest of release inputs.
  • Preparation rejects staged or unstaged tracked changes with a list of affected paths.
  • A plan whose base commit or input digest changed is rejected even when the checkout is clean.

Implementation constraints

  • Use Git argument arrays rather than composing shell commands.
  • Document whether untracked files participate in the release input set.

Verification to include

  • Prepare a clean fixture checkout successfully.
  • Stage one manifest change and separately advance HEAD; the old plan must be rejected in each case.

Deliverables

  • Stale-plan guard and reproducibility note

Rollout and recovery

Enable guards before any write command; disable preparation if repository state cannot be determined.

Value of the work

For the engineer: Practice CLI contracts, graph reasoning, filesystem safety, and recovery from partial work.

For the team: Review how an engineer makes release changes inspectable and recoverable before they affect consumers.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.