noCV
CLINK-108 · Test interruption

Keep the mobile Back stack free of completed sign-in screens

Practice briefBugIntermediate

After joining a team, Back returns to a completed sign-in screen that resubmits. Replace transient routes on success.

Focused work estimate
1h 45m + prerequisites
Priority in the scenario
Medium
Engineering practice
Navigation · State transitions

Estimated field mix

  • Mobile100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional team-planning app Finch opens invitations and shared work items. All users and sessions are synthetic; implement the app in an emulator without external identity credentials.

Setup prerequisites

  • Create a local session adapter with expiry and revocation.
  • Define synthetic invitation and work-item links.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Back reaches prior meaningful screen
  • Completed forms cannot resubmit
  • Failed sign-in remains editable

Implementation constraints

  • Specify stack behavior for cold and warm launches.

Verification to include

  • Complete cold-launch sign-in
  • Fail then retry warm launch

Deliverables

  • Stack transition and navigation tests

Rollout and recovery

Reset to home after sign-in if replacement fails.

Value of the work

For the engineer: Practice navigation state, capability checks and session boundaries.

For the team: Inspect whether links remain useful without bypassing authorization.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.