noCV
CLSP-108 · Handle client interruption

Cancel language-server requests without leaking pending work

Practice briefChoreIntermediate

Repeated completion cancellation leaves tasks in memory. Add request-scoped cleanup for all terminal paths.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Cancellation · Resource management

Estimated field mix

  • Compiler and language tooling60%
  • Performance engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional config editor Hazel speaks a bounded subset of the Language Server Protocol through a local transport adapter. Use a tiny declared configuration grammar and synthetic documents.

Setup prerequisites

  • Define the supported protocol subset and configuration grammar.
  • Create synthetic open/change/close messages and workspace fixtures.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Success removes pending entry
  • Cancellation removes entry
  • Late result does not emit another response

Implementation constraints

  • Request IDs may be reused only per protocol rules.

Verification to include

  • Complete request
  • Cancel then deliver late result

Deliverables

  • Request registry and cleanup tests

Rollout and recovery

Limit concurrency if cleanup cannot be guaranteed.

Value of the work

For the engineer: Practice protocol ordering and document-safe editing.

For the team: Inspect whether editor assistance preserves current user text and file boundaries.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.