noCV
COBJS-109 · Recover abandoned work

Expose multipart upload progress from acknowledged bytes

Practice briefStoryIntermediate

Progress reaches 100 percent before the provider accepts the final part. Count acknowledged bytes separately from verification state.

Focused work estimate
1h 45m + prerequisites
Priority in the scenario
Medium
Engineering practice
State projection · UX

Estimated field mix

  • Frontend50%
  • Storage systems30%
  • API design20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional document archive Fern stores synthetic byte objects. Use a local S3-compatible adapter or deterministic in-memory provider; no cloud credentials are needed.

Setup prerequisites

  • Generate small deterministic byte fixtures.
  • Implement local multipart provider responses including timeout and missing parts.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Progress uses accepted parts
  • Completion remains pending verification
  • Retransmission does not double-count

Implementation constraints

  • Do not treat socket bytes sent as durable storage.

Verification to include

  • Upload three parts
  • Timeout accepted part and reconcile

Deliverables

  • Progress projection and cases

Rollout and recovery

Display state-only progress if byte accounting diverges.

Value of the work

For the engineer: Practice object lifecycle, retry semantics and integrity verification.

For the team: Inspect whether uploads avoid corruption, orphan cost and tenant crossover.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.