Expose multipart upload progress from acknowledged bytes
Progress reaches 100 percent before the provider accepts the final part. Count acknowledged bytes separately from verification state.
- Focused work estimate
- 1h 45m + prerequisites
- Priority in the scenario
- Medium
- Engineering practice
- State projection · UX
Estimated field mix
- Frontend50%
- Storage systems30%
- API design20%
Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.
Review it, then add it to your workspace.
The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.
Project context
Fictional document archive Fern stores synthetic byte objects. Use a local S3-compatible adapter or deterministic in-memory provider; no cloud credentials are needed.
Setup prerequisites
- Generate small deterministic byte fixtures.
- Implement local multipart provider responses including timeout and missing parts.
Preceding work
Complete these dependencies, or supply their agreed outputs before taking this ticket.
- COBJS-101 · Normalize object names without treating them as filesystem paths
- COBJS-102 · Bind multipart upload sessions to organization and object identity
- COBJS-103 · Reject multipart uploads exceeding declared size limits
- COBJS-104 · Retry the same multipart part without creating contradictory receipts
- COBJS-105 · Validate ordered multipart completion against acknowledged parts
- COBJS-106 · Verify completed object content before marking it available
- COBJS-107 · Recover a timeout between multipart finalization and metadata commit
- COBJS-108 · Abort expired multipart sessions without touching completed objects
Acceptance criteria
- Progress uses accepted parts
- Completion remains pending verification
- Retransmission does not double-count
Implementation constraints
- Do not treat socket bytes sent as durable storage.
Verification to include
- Upload three parts
- Timeout accepted part and reconcile
Deliverables
- Progress projection and cases
Rollout and recovery
Display state-only progress if byte accounting diverges.
Value of the work
For the engineer: Practice object lifecycle, retry semantics and integrity verification.
For the team: Inspect whether uploads avoid corruption, orphan cost and tenant crossover.