noCV
CROUTE-105 · Protect offline work

Preserve conflicting offline visit notes for explicit resolution

Practice briefStoryAdvanced

Two emulators edit one visit offline and last-write-wins removes a paragraph. Surface both revisions.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Conflict resolution · Revision control

Estimated field mix

  • Mobile50%
  • Distributed systems50%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional maintenance coordinator Elm dispatches non-safety-critical inspection visits. Implement a mobile application in an emulator with local API stubs; physical devices and credentials are unnecessary.

Setup prerequisites

  • Create synthetic visits and a local sync adapter.
  • Provide controllable connectivity and process-restart simulation.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Conflict preserves both texts
  • No silent merge occurs
  • Resolution creates a new revision

Implementation constraints

  • Synthetic notes only; omit content from logs.

Verification to include

  • Resolve two independent drafts
  • Reject a stale resolution revision

Deliverables

  • Conflict screen and revision cases

Rollout and recovery

Keep conflicts read-only while resolver is repaired.

Value of the work

For the engineer: Practice durable mobile state and explicit sync conflicts.

For the team: Inspect how an engineer protects field work during disconnection.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.