noCV
CROUTE-108 · Recover interruptions

Bound offline route-note retry backoff

Practice briefChoreIntermediate

A disconnected emulator retries uploads continuously and drains resources. Add capped backoff with manual retry semantics.

Focused work estimate
1h 45m + prerequisites
Priority in the scenario
Medium
Engineering practice
Scheduling · Backoff

Estimated field mix

  • Mobile60%
  • Site reliability40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional maintenance coordinator Elm dispatches non-safety-critical inspection visits. Implement a mobile application in an emulator with local API stubs; physical devices and credentials are unnecessary.

Setup prerequisites

  • Create synthetic visits and a local sync adapter.
  • Provide controllable connectivity and process-restart simulation.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Delays grow to cap
  • Connectivity recovery can wake once
  • Manual retry cannot create parallel senders

Implementation constraints

  • Inject timers; avoid wall-clock sleeps in tests.

Verification to include

  • Observe scheduled delays
  • Toggle connectivity repeatedly

Deliverables

  • Retry scheduler and fake-clock tests

Rollout and recovery

Stop automatic retries and expose manual sync.

Value of the work

For the engineer: Practice durable mobile state and explicit sync conflicts.

For the team: Inspect how an engineer protects field work during disconnection.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.