noCV
CTABLE-107 · Operate report controls

Keep report details discoverable after virtualized rows leave view

Practice briefBugExpert

Expanded row details unmount during scrolling and leave focus nowhere. Bound virtualization around active interaction.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Virtualization · Focus management

Estimated field mix

  • Accessibility40%
  • Performance engineering30%
  • Frontend30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional cooperative Quarry reviews synthetic service-volume reports. Build local report fixtures with empty, missing and delayed values.

Setup prerequisites

  • Create synthetic report series with explicit missing values.
  • Stub report loading, sorting and export responses.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Focused details remain mounted
  • Collapsed rows release retained nodes
  • Large fixtures stay within documented DOM budget

Implementation constraints

  • Do not pin every previously opened row forever.

Verification to include

  • Scroll focused detail out of view
  • Collapse and verify reclamation

Deliverables

  • Focus-aware virtualization policy

Rollout and recovery

Disable virtualization for interactive details if focus is lost.

Value of the work

For the engineer: Practice semantic data presentation and robust interaction.

For the team: Inspect whether reporting decisions remain possible without color or pointer use.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.