noCV
CTIMER-106 · Control job execution

Bound emulated edge-job execution attempts after failure

Practice briefStoryIntermediate

A failed maintenance job retries forever and hides the original error. Add attempt limits and a terminal visible outcome.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Backoff · Failure handling

Estimated field mix

  • Embedded and edge70%
  • Site reliability30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional kiosk software schedules cache refresh and display housekeeping. Build a software clock and job adapter; do not control real machinery or purchase hardware.

Setup prerequisites

  • Implement injected wall and monotonic clocks.
  • Create synthetic jobs with controllable completion and failure.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Attempts have an explicit cap
  • Success clears pending retry
  • Exhaustion preserves failure category

Implementation constraints

  • Retrying must reuse the same logical operation identity.

Verification to include

  • Recover before cap
  • Fail through exhaustion

Deliverables

  • Retry policy and deterministic cases

Rollout and recovery

Disable automatic retry while retaining manual restart.

Value of the work

For the engineer: Practice timer semantics, cancellation and bounded scheduling.

For the team: Inspect predictable edge resource use and honest execution status.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.