noCV
CTYPE-108 · Keep checking predictable

Make rules-editor diagnostics deterministic across map insertion order

Practice briefBugIntermediate

Equivalent AST construction order changes diagnostic output and noisy snapshots. Sort by source and stable category.

Focused work estimate
2h + prerequisites
Priority in the scenario
Medium
Engineering practice
Determinism · Diagnostics

Estimated field mix

  • Compiler and language tooling100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional rules editor Willow supports numbers, strings, booleans, records and functions in a deliberately small language. Define syntax and type rules locally; no arbitrary code execution is needed.

Setup prerequisites

  • Create synthetic AST fixtures and a written type-rule table.
  • Define source spans and structured diagnostic output.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Equivalent inputs yield same order
  • Related locations stay attached
  • Equal-span tie-breaking is documented

Implementation constraints

  • Determinism must not remove distinct failures.

Verification to include

  • Reorder environment construction
  • Create two same-span categories

Deliverables

  • Diagnostic ordering and cases

Rollout and recovery

Preserve stable source traversal if sorting loses relationships.

Value of the work

For the engineer: Practice type environments, unification and explainable rejection.

For the team: Inspect whether developer tooling catches mistakes without hiding uncertainty.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.