noCV
CUPDATE-103 · Validate update candidates

Validate edge-update manifests using local trust fixtures

Practice briefTaskIntermediate

The simulator accepts any manifest signature. Add a trust adapter using ephemeral development keys.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Cryptography · Provider interfaces

Estimated field mix

  • Security70%
  • Embedded and edge30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

Fictional information kiosks receive small generated image blobs through a local update adapter. Simulate slots and boot outcomes in software; do not flash hardware or execute image contents.

Setup prerequisites

  • Generate inert byte images with manifests and development-only signing fixtures.
  • Implement simulated boot success failure and power-cut points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Trusted fixture signature passes
  • Unknown signer fails
  • Tampered manifest fails

Implementation constraints

  • No private keys enter source control or production configuration.

Verification to include

  • Verify local signed fixture
  • Change signed manifest field

Deliverables

  • Trust adapter and negative cases

Rollout and recovery

Disable update acceptance if trusted verification is unavailable.

Value of the work

For the engineer: Practice update state machines and recoverable activation.

For the team: Inspect whether an engineer can prevent partial rollout from stranding devices under declared conditions.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.