noCV
DCI-106 · Control change and failure

Quarantine a flaky test without making it optional forever

Practice briefBugAdvanced

A timing-sensitive test is retried until it passes, hiding a rising failure rate and extending every pull request.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Flake management · Policy as code · Test analytics

Estimated field mix

  • DevOps60%
  • Quality engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional TypeScript monorepo has twelve packages and a local CI simulator. Pull requests wait for redundant work, stale caches occasionally pass broken changes, and superseded runs continue consuming executors. Create synthetic package graphs and fake check APIs; no hosted CI credentials or production repositories are supplied.

Setup prerequisites

  • Dependency graphs
  • Process exit codes
  • Test isolation

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • First-attempt and retry outcomes remain separate
  • Quarantine has owner, reason, expiry, and tracking reference
  • Expired quarantine fails the policy check

Implementation constraints

  • Do not classify a test as flaky from one failure; use the supplied deterministic failure history.

Verification to include

  • Quarantine the documented test and keep its outcomes visible.
  • Expire or omit ownership and confirm the pipeline blocks rather than silently skips.

Deliverables

  • Quarantine registry, policy check, and trend fixture

Rollout and recovery

Limit quarantine to named tests and review before expiry.

Value of the work

For the engineer: Practice treating CI as a versioned delivery system with correctness, latency, and recovery constraints.

For the team: Review a pipeline that reduces wasted compute without allowing stale or skipped checks to approve changes.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.