DDEV-107 · Control change and failure

Support an offline bootstrap from a verified local cache

Practice briefStoryExpert

Developers lose network access during an incident rehearsal and bootstrap cannot tell which packages and service images are already available locally.

Focused work estimate
6h + prerequisites
Priority in the scenario
High
Engineering practice
Offline workflows · Artifact integrity · Dependency management

Estimated field mix

  • DevOps60%
  • Developer tooling40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional support portal requires a database, cache, object store, and mail catcher. Setup lives in personal notes, reset scripts sometimes target shared resources, and offline work fails after package caches are cleared. Build a local-only development contract with synthetic data; no shared staging system or production credentials are supplied.

Setup prerequisites

  • Environment variables
  • Service health
  • Database migrations

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Offline manifest lists exact package and image digests
  • Bootstrap verifies every cached artifact before use
  • Missing items produce a complete acquisition list without partial startup

Implementation constraints

  • Do not bypass integrity checks or contact a network when offline mode is selected.

Verification to include

  • Bootstrap from a complete verified cache with network access denied.
  • Remove and corrupt separate artifacts and report both before starting services.

Deliverables

  • Offline manifest, verifier, and disconnected tests

Rollout and recovery

Treat offline support as explicit mode with a generated cache preparation step.

Value of the work

For the engineer: Practice developer-environment automation, safe reset boundaries, portability, and diagnostic quality.

For the team: Reduce onboarding and support cost while making local dependencies and destructive operations explicit.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.