DREL-103 · Make the delivery contract visible

Promote the built artifact instead of rebuilding it

Practice briefStoryIntermediate

Staging and production-like environments run images compiled at different times from the same source label.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Artifact promotion · Immutability

Estimated field mix

  • DevOps70%
  • Cloud infrastructure30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional scheduling API is rebuilt separately for test, staging, and production-like local environments. The resulting images differ, release notes list the branch instead of the artifact, and rollback rebuilds old source with new dependencies. Use a local registry simulator and synthetic deployments; no cluster or customer traffic is supplied.

Setup prerequisites

  • Artifact digests
  • Release states
  • Health checks

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Build creates one content-addressed artifact
  • Promotion changes environment references without changing bytes
  • Environment record retains promotion actor, time, and source environment

Implementation constraints

  • Configuration remains external and versioned; it is not baked differently into each image.

Verification to include

  • Promote one digest through two fixture environments and compare bytes.
  • Attempt promotion with a mismatching manifest and block the transition.

Deliverables

  • Promotion command and byte-identity tests

Rollout and recovery

Adopt from test to staging before changing the final environment.

Value of the work

For the engineer: Practice immutable promotion, release authority, compatibility gates, canaries, and rollback.

For the team: Review a delivery flow that can identify exactly what is running and restore a known artifact without rebuilding it.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.