Stop expired quotes from holding carrier connections
A client disconnects after its deadline, but the carrier lookup continues and consumes one of the few available connections.
- Focused work estimate
- 3h 30m + prerequisites
- Priority in the scenario
- High
- Engineering practice
- Cancellation · Resource lifecycle
Estimated field mix
- Performance engineering40%
- Networking30%
- Backend30%
Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.
Review it, then add it to your workspace.
The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.
Project context
A fictional freight broker sees slow quote responses at dispatch handover. The service looks healthy in average-latency charts, yet a few long requests occupy every worker. Build a small synthetic quote service and controlled dependency stub before taking implementation tickets.
Setup prerequisites
- Create a local quote endpoint and a deterministic carrier-price stub; no repository or dataset is supplied.
- Use synthetic routes and a fixed workload manifest. Record runtime, machine resources and instrumentation settings.
Preceding work
Complete these dependencies, or supply their agreed outputs before taking this ticket.
Acceptance criteria
- Propagate the remaining deadline through queue admission and the carrier client.
- Release the connection and remove queued work when the request is cancelled, including cancellation before dispatch.
- Return one bounded timeout outcome without automatically retrying a request whose caller has left.
Implementation constraints
- Use the stub to control headers, body completion and connection close separately; wall-clock sleeps alone do not prove cleanup.
Verification to include
- Cancel before dispatch, while waiting for headers and during a streamed response; count active work returning to baseline.
- Race normal completion against cancellation and confirm one response classification and no unhandled rejection.
Deliverables
- Deadline propagation and deterministic cancellation tests
Rollout and recovery
Canary the deadline path with active-connection counters; restore the previous client only after pending work drains.
Value of the work
For the engineer: Learn to distinguish queueing, dependency delay, CPU work and measurement mistakes using reproducible observations.
For the team: Produce a reviewable diagnosis and guarded changes that could guide a team investigating customer-visible latency.
Evidence boundaries
Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.
Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.