noCV
PLATENCY-105 · Remove demonstrated bottlenecks

Stop expired quotes from holding carrier connections

Practice briefBugAdvanced

A client disconnects after its deadline, but the carrier lookup continues and consumes one of the few available connections.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Cancellation · Resource lifecycle

Estimated field mix

  • Performance engineering40%
  • Networking30%
  • Backend30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional freight broker sees slow quote responses at dispatch handover. The service looks healthy in average-latency charts, yet a few long requests occupy every worker. Build a small synthetic quote service and controlled dependency stub before taking implementation tickets.

Setup prerequisites

  • Create a local quote endpoint and a deterministic carrier-price stub; no repository or dataset is supplied.
  • Use synthetic routes and a fixed workload manifest. Record runtime, machine resources and instrumentation settings.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Propagate the remaining deadline through queue admission and the carrier client.
  • Release the connection and remove queued work when the request is cancelled, including cancellation before dispatch.
  • Return one bounded timeout outcome without automatically retrying a request whose caller has left.

Implementation constraints

  • Use the stub to control headers, body completion and connection close separately; wall-clock sleeps alone do not prove cleanup.

Verification to include

  • Cancel before dispatch, while waiting for headers and during a streamed response; count active work returning to baseline.
  • Race normal completion against cancellation and confirm one response classification and no unhandled rejection.

Deliverables

  • Deadline propagation and deterministic cancellation tests

Rollout and recovery

Canary the deadline path with active-connection counters; restore the previous client only after pending work drains.

Value of the work

For the engineer: Learn to distinguish queueing, dependency delay, CPU work and measurement mistakes using reproducible observations.

For the team: Produce a reviewable diagnosis and guarded changes that could guide a team investigating customer-visible latency.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.