noCV
PLATENCY-107 · Remove demonstrated bottlenecks

Check whether quote serialization is blocking unrelated requests

Practice briefTaskIntermediate

The largest multi-stop responses correlate with event-loop delay. The team has proposed adding workers before confirming where time is spent.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Profiling · Experimental design

Estimated field mix

  • Performance engineering70%
  • Backend30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional freight broker sees slow quote responses at dispatch handover. The service looks healthy in average-latency charts, yet a few long requests occupy every worker. Build a small synthetic quote service and controlled dependency stub before taking implementation tickets.

Setup prerequisites

  • Create a local quote endpoint and a deterministic carrier-price stub; no repository or dataset is supplied.
  • Use synthetic routes and a fixed workload manifest. Record runtime, machine resources and instrumentation settings.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Capture CPU and event-loop delay measurements for small and maximum-size synthetic quote responses.
  • Separate JSON serialization cost from database and dependency time in the experiment.
  • Produce a decision note identifying the measured bottleneck, uncertainty and one bounded next change; report when the hypothesis is unsupported.

Implementation constraints

  • Use three repeated baseline runs after warmup on the same runtime and resource limits; save the measurement commands.

Verification to include

  • Repeat with a prebuilt response body to isolate serialization while retaining the same payload size.
  • Run a small health request concurrently and compare its tail latency with and without the large-response workload.

Deliverables

  • Reproducible profiling report and supported next-step decision

Rollout and recovery

This investigation changes no serving path; retain the baseline commands for the implementation review.

Value of the work

For the engineer: Learn to distinguish queueing, dependency delay, CPU work and measurement mistakes using reproducible observations.

For the team: Produce a reviewable diagnosis and guarded changes that could guide a team investigating customer-visible latency.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.