noCV
SCONCUR-101 · Establish the machine contract

Define queue ownership before starting worker threads

Practice briefTaskFoundational

Workers borrow configuration from a stack-owned builder that disappears after start, while the queue handle can outlive the pool.

Focused work estimate
1h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Ownership · Thread lifecycle

Estimated field mix

  • Systems programming70%
  • Developer tooling30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional image-indexing utility runs CPU-only synthetic jobs through a Rust worker pool. Its prototype loses wakeups, blocks shutdown, and treats cancellation as completion. Build a local library and deterministic concurrency harness; image content, GPU work, and production deployment are excluded.

Setup prerequisites

  • Mutexes and condition variables
  • Atomics
  • Thread lifecycle

Preceding work

No earlier ticket is required. Complete the project setup above.

Acceptance criteria

  • Pool-owned state outlives every worker
  • Queue handles cannot submit after terminal shutdown
  • Dropping the final handle has documented behavior

Implementation constraints

  • Avoid leaked static references and process-wide mutable state.

Verification to include

  • Create, submit, join, and drop a pool repeatedly under a leak checker.
  • Drop external handles in different orders and verify workers cannot access released state.

Deliverables

  • Ownership diagram and lifecycle tests

Rollout and recovery

Keep the single-thread runner until lifecycle checks pass.

Value of the work

For the engineer: Practice happens-before reasoning, ownership transfer, cancellation and liveness testing.

For the team: Review a worker primitive whose overload and shutdown behavior are predictable before it supports build or media workloads.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.