noCV
SFFI-104 · Control resources and concurrency

Release native output after JavaScript cancellation

Practice briefChoreIntermediate

The caller abandons a promise while native work finishes later; its output buffer has no remaining JavaScript consumer and is leaked.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Cancellation · FFI cleanup · Concurrency

Estimated field mix

  • Systems programming70%
  • Real-time systems30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional desktop backup tool calls a small Rust compression library from Node.js. The binding leaks buffers on exceptions and treats ABI mismatches as corrupted input. Build against generated byte arrays and a local native library; no production archive format or user files are supplied.

Setup prerequisites

  • FFI ownership
  • Binary compatibility
  • Error handling

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Operation state records whether a result still has a consumer
  • Late output is released on the native allocation thread or declared safe path
  • Cancellation and completion races release once

Implementation constraints

  • Cancellation is cooperative; do not unload code while a native call is running.

Verification to include

  • Cancel before start and after successful delivery.
  • Race cancellation with native completion across repeated deterministic schedules.

Deliverables

  • Cancellation cleanup protocol and race tests

Rollout and recovery

Keep native concurrency at one until release counts reconcile.

Value of the work

For the engineer: Practice language-boundary contracts, native resource safety and version negotiation.

For the team: Review a binding that fails safely and can be rolled back before native code enters additional application paths.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.