noCV
SIPC-103 · Establish the machine contract

Correlate out-of-order worker replies to the right caller

Practice briefStoryIntermediate

Two conversions finish in reverse order and the supervisor resolves the first waiter with the second result.

Focused work estimate
2h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Correlation IDs · Concurrency

Estimated field mix

  • Systems programming70%
  • Distributed systems30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional document converter launches local sandbox substitutes as child processes. Its prototype parses newline-delimited output, leaks descriptors, and retries requests after ambiguous worker exits. Create a Rust supervisor and deterministic worker fixtures; no document content or production sandbox is supplied.

Setup prerequisites

  • File descriptors
  • Framing
  • Process signals

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Every accepted request has a unique operation identity
  • Replies resolve only the matching pending request
  • Duplicate and unknown replies are recorded without completing another caller

Implementation constraints

  • Keep the pending map bounded by admission capacity and deadlines.

Verification to include

  • Complete three requests in reverse order and verify each result.
  • Send a duplicate and an unknown identity and confirm pending callers remain unchanged.

Deliverables

  • Correlation table and ordering tests

Rollout and recovery

Enable concurrent requests only after correlation checks pass.

Value of the work

For the engineer: Practice IPC contracts, resource inheritance, process supervision and ambiguous completion.

For the team: Review a local worker boundary that contains crashes and preserves request outcomes before connecting an isolated execution provider.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.