noCV
SYNC-106 · Ingest changes safely

Distinguish a discontinued item from an item missing on one page

Practice briefStoryExpert

A transient missing page made hundreds of products look deleted. Apply absence-based tombstones only after a complete authoritative snapshot, while preserving explicit deletion events.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
High
Engineering practice
Snapshot consistency · Reconciliation · Deletion semantics · Race conditions

Estimated field mix

  • Integrations50%
  • Data engineering30%
  • Distributed systems20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional retailer receives stock from two vendor warehouses. The vendor API paginates snapshots and emits change events, but retries and deleted products have caused unexplained stock drift. Work against a local vendor simulator.

Setup prerequisites

  • Create a local vendor API simulator with cursor pages and stock events.
  • Use synthetic tenants, SKUs, and warehouse records; no vendor account is required.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • An incomplete snapshot cannot discontinue items through absence.
  • A completed snapshot marks only previously mapped items absent from that exact vendor scope as candidates for discontinuation.
  • A newer explicit stock event received during snapshot ingestion is not overwritten by an older absence decision.

Implementation constraints

  • Record the snapshot consistency boundary and event watermark.
  • If the simulator cannot guarantee a consistency boundary, surface uncertainty and require review.

Verification to include

  • Fail the final page and verify no absence-based tombstones are applied.
  • Deliver a newer event during snapshot ingestion and confirm finalization preserves it or reports a review conflict.

Deliverables

  • Snapshot finalization policy and deletion/event race tests

Rollout and recovery

Generate discontinuation proposals first; enable automatic tombstones only for connectors with the documented snapshot guarantee.

Value of the work

For the engineer: Practice external contracts, cursor recovery, mapping conflicts, and reconciliation under partial failure.

For the team: Inspect whether integration changes protect inventory correctness and give operators a clear recovery path.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.