noCV
TRIP-103 · Make journeys readable

Explain transfers without relying on line colors

Practice briefTaskFoundational

The journey card distinguishes Line 4 from Line 8 only by color. Riders using grayscale or a screen reader cannot tell where to change.

Focused work estimate
1h 15m + prerequisites
Priority in the scenario
Medium
Engineering practice
Mobile accessibility · Information design · Compose

Estimated field mix

  • Accessibility60%
  • Mobile40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

The fictional Northline commuter app plans bus and rail trips from synthetic timetable and alert feeds. Riders save journeys and choose optional reminders. The scope excludes ticket purchases, safety guarantees, and continuous location collection.

Setup prerequisites

  • Synthetic timetable with explicit time zones and service dates
  • Departure, alert, and permission adapters with failure fixtures

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Each leg shows mode, line label, destination, and boarding/alighting stops in reading order.
  • Transfers state walking and waiting time in text.
  • Large text and grayscale preserve every required leg distinction.

Implementation constraints

  • Keep decorative map graphics out of the essential accessible description.

Verification to include

  • Read a two-transfer fixture with assistive navigation and compare spoken order to itinerary order.
  • Use grayscale and large text; a canceled leg must remain identifiable without its color or icon.

Deliverables

  • Accessible journey-leg card and device walkthrough

Rollout and recovery

Release text semantics with the existing card layout first; revert visual changes independently if leg details become clipped.

Value of the work

For the engineer: Practice temporal modeling, feed reconciliation, battery-conscious refresh, and mobile permission design.

For the team: Review how an engineer communicates uncertainty and keeps a consumer app useful under unreliable data.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.