noCV
ABATCH-104 · Coordinate parallel outcomes

Dispatch each check through a durable deterministic attempt identity

Practice briefStoryAdvanced

The coordinator crashes after dispatching one checker and cannot tell which of the three still needs to start.

Focused work estimate
4h + prerequisites
Priority in the scenario
Medium
Engineering practice
Outbox · Idempotency

Estimated field mix

  • Distributed systems60%
  • Database engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional vendor portal runs format, policy and duplicate checks in parallel. A slow checker blocks completion, while duplicate callbacks can produce contradictory final summaries.

Setup prerequisites

  • Create synthetic document identities and three fake check providers.
  • No real risk scoring, hiring decisions or candidate execution is included.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Persist check-attempt identity and outbox dispatch per required checker.
  • Keep dispatch retries bound to the same input and checker version.
  • Reject contradictory reuse of an attempt identity.

Implementation constraints

  • Call providers outside the database transaction.

Verification to include

  • Crash after one dispatched check and resume remaining work.
  • Replay an outbox fact and keep one logical provider attempt.

Deliverables

  • Check dispatch transaction and crash probe

Rollout and recovery

Prototype with fake providers; stop new runs if attempt identity cannot be persisted.

Value of the work

For the engineer: Practice fan-out/fan-in, deadline policies and immutable aggregation.

For the team: Review trustworthy partial-result handling and controllable parallel work.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.