noCV
ABOUND-105 · Specify the interactions

Design the transactional dispatch contract for extraction work

Practice briefTaskAdvanced

An accepted upload can be stranded if the API commits metadata and crashes before calling the processing provider.

Focused work estimate
4h + prerequisites
Priority in the scenario
Medium
Engineering practice
Transactional outbox · Recovery

Estimated field mix

  • System design40%
  • Distributed systems40%
  • Database engineering20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional procurement portal extracts metadata from uploaded documents. Product wants a responsive upload flow; security wants parser failures isolated from customer-facing processes.

Setup prerequisites

  • Create synthetic upload metadata and a fake processing provider.
  • Treat diagrams as proposals; implement only local contract probes.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Commit upload acceptance and an outbox fact together.
  • Derive a deterministic dispatch identity from the accepted generation.
  • Specify claim, retry and duplicate-delivery behavior.

Implementation constraints

  • Use PostgreSQL plus a local provider fake, without adding a broker topology.

Verification to include

  • Crash after transaction commit and recover dispatch from the outbox.
  • Repeat provider delivery and prove one accepted completion.

Deliverables

  • Outbox contract and interruption probe

Rollout and recovery

Prototype on synthetic uploads; halt new acceptance if durable dispatch cannot be recorded.

Value of the work

For the engineer: Practice boundary decisions backed by executable consistency and failure checks.

For the team: Review architecture tradeoffs with explicit assumptions before infrastructure commitment.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.