noCV
ACLAIM-104 · Protect concurrent transitions

Claim one pending job atomically under competing pollers

Practice briefStoryAdvanced

Two polling clients select the same pending job before either writes its assignment.

Focused work estimate
4h + prerequisites
Priority in the scenario
High
Engineering practice
Row locking · Transactions

Estimated field mix

  • Database engineering100%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inspection service assigns review jobs to staff. Polling clients sometimes claim the same job and a disconnected client can finish work after reassignment.

Setup prerequisites

  • Create synthetic jobs and two independent database clients.
  • Use explicit state methods and an injected clock.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Select and transition a job within one transaction.
  • Use a database locking strategy with documented contention behavior.
  • Return distinct jobs or no work under concurrent pollers.

Implementation constraints

  • Evaluate SKIP LOCKED against the declared ordering and fairness policy.

Verification to include

  • Start two clients at a barrier and assert unique claimed identities.
  • Hold one candidate lock and verify the documented skip or wait behavior.

Deliverables

  • Atomic claim query and concurrency test

Rollout and recovery

Canary with two synthetic pollers; reduce concurrency if lock behavior violates the contract.

Value of the work

For the engineer: Practice database concurrency, leases and transactional invariants.

For the team: Review whether assignment authority remains reliable during contention and recovery.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.