AINGEST-107 · Load traceable records

Use event-time watermarks without discarding late telemetry silently

Practice briefTaskAdvanced

The hourly aggregate closes by arrival time and quietly ignores a delayed batch from an offline device.

Focused work estimate
3h 30m + prerequisites
Priority in the scenario
Medium
Engineering practice
Event time · Aggregation

Estimated field mix

  • Data engineering70%
  • Real-time systems30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional energy dashboard receives hourly device batches. Corrupt archives and late corrections leave operators unsure which readings reached reports.

Setup prerequisites

  • Create synthetic device batches and local object-store fixtures.
  • Understand checksums and bounded streaming.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Define watermark advancement and allowed lateness.
  • Route late readings to a visible correction path.
  • Report aggregate revision when late data changes a result.

Implementation constraints

  • Test with a controlled clock and explicit event timestamps.

Verification to include

  • Deliver an in-window late reading and update the expected aggregate.
  • Deliver beyond the lateness window and verify visible deferred correction.

Deliverables

  • Watermark logic and late-arrival fixtures

Rollout and recovery

Run alongside the prior aggregate; switch readers only after discrepancy review.

Value of the work

For the engineer: Practice batch integrity, replay and data-quality boundaries.

For the team: Review whether operational data can be traced, corrected and recovered.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.