ALEASE-107 · Guard competing owners

Make scheduled maintenance occurrences idempotent across leadership changes

Practice briefStoryAdvanced

A new leader repeats the current maintenance period and creates a second plan for the same logical occurrence.

Focused work estimate
4h + prerequisites
Priority in the scenario
Medium
Engineering practice
Idempotency · Scheduling

Estimated field mix

  • Distributed systems60%
  • Database engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional document service runs periodic retention planning on multiple application instances. Paused instances resume after lease expiry and can overlap newer schedulers.

Setup prerequisites

  • Create a synthetic maintenance queue and two independent scheduler clients.
  • Use fake time where possible and no destructive real retention actions.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Derive occurrence identity from schedule and intended UTC instant.
  • Enforce one durable logical run per occurrence.
  • Allow a new owner to resume existing nonterminal work safely.

Implementation constraints

  • Do not derive identity from acquisition time or process name.

Verification to include

  • Change leader midway through an occurrence and retain one run.
  • Retry a terminal occurrence and return its recorded result.

Deliverables

  • Occurrence identity contract and leader-change test

Rollout and recovery

Enable idempotent creation before multi-instance operation; reconcile existing duplicates through read-only reports.

Value of the work

For the engineer: Practice lease assumptions, fencing and stale-owner rejection.

For the team: Review safe coordination that remains explainable under pauses and recovery.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.