noCV
AMERGE-109 · Recover interrupted synchronization

Resume inspection synchronization from a server-confirmed cursor

Practice briefTaskExpert

The tablet stores a local cursor before receiving server confirmation and skips updates after a crash.

Focused work estimate
5h + prerequisites
Priority in the scenario
Medium
Engineering practice
Checkpointing · Recovery

Estimated field mix

  • Distributed systems60%
  • Mobile40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional field team inspects equipment with intermittent connectivity. Two tablets can edit the same checklist and an old upload may restore a deleted finding.

Setup prerequisites

  • Create two local client-state simulators and a synthetic inspection API.
  • Use fabricated notes and local attachment bytes.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Advance the local acknowledged cursor only after durable server outcome.
  • Bind cursor to inspection scope and sync generation.
  • Require resnapshot when the server cannot honor the retained history window.

Implementation constraints

  • Use two client simulators with controlled interruption points.

Verification to include

  • Crash during a sync page and resume without missing confirmed operations.
  • Use an expired or cross-scope cursor and reject incremental sync safely.

Deliverables

  • Cursor recovery protocol and crash harness

Rollout and recovery

Enable incremental sync after the resnapshot path passes; retain local pending operations until acknowledged.

Value of the work

For the engineer: Practice offline synchronization, causal revisions and conflict resolution.

For the team: Review whether field work survives disconnection without hiding conflicting observations.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.