noCV
AMIGRATE-110 · Contract after verification

Retire legacy customer references only after a rollback rehearsal

Practice briefChoreExpert

Dropping old columns would end binary rollback to old readers, but the release checklist does not mention that boundary.

Focused work estimate
5h + prerequisites
Priority in the scenario
High
Engineering practice
Migration planning · Recovery

Estimated field mix

  • Database engineering60%
  • Platform engineering40%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional support platform stores a mutable external account code as its primary relationship key. Renames and imports now break references in several tables.

Setup prerequisites

  • Create a disposable database with synthetic customers and dependent records.
  • Apply real migration files; never use production db push.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Inventory remaining legacy reads and writes before contraction.
  • Rehearse the last reversible rollback with compatible code.
  • Document the point after which forward repair is required.

Implementation constraints

  • Do not drop columns merely because the backfill command completed.

Verification to include

  • Run the old-compatible build against the expanded schema.
  • Attempt the contraction readiness check with one legacy writer and verify it blocks.

Deliverables

  • Contraction migration plan and rollback evidence

Rollout and recovery

Apply contraction only after reviewed readiness; preserve a tested backup and forward-repair procedure.

Value of the work

For the engineer: Practice migration ordering, compatibility and referential integrity.

For the team: Review a reversible schema transition with measurable completeness checks.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.