noCV
BAPIBULK-103 · Define operation resources

Create bulk operations with tenant-scoped idempotency

Practice briefTaskAdvanced

A timeout after admission causes the partner to submit the same catalog import again.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Idempotency · Transactions

Estimated field mix

  • API design40%
  • Database engineering30%
  • Backend30%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional catalog API needs to accept imports too large for one synchronous request. Partners need to distinguish accepted work, completed items, and recoverable failures.

Setup prerequisites

  • Create a local API and worker double with synthetic catalog records and controlled interruption points.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Bind key to tenant and canonical request digest.
  • Return the existing operation on exact replay.
  • Reject changed input under the same key.

Implementation constraints

  • Commit operation and dispatch intent atomically.

Verification to include

  • Replay a lost admission response.
  • Race conflicting requests and preserve one operation identity.

Deliverables

  • Bulk admission command.

Rollout and recovery

Keep operation identity stable through retries.

Value of the work

For the engineer: Practice asynchronous resource contracts, partial outcomes, and idempotent operations.

For the team: Provide predictable bulk integration behavior without ambiguous success or repeated effects.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.