noCV
BAPIVER-103 · Implement coexistence

Keep legacy and new projections over one domain authority

Practice briefTaskAdvanced

Separate version handlers duplicate inventory rules and begin disagreeing.

Focused work estimate
3h + prerequisites
Priority in the scenario
High
Engineering practice
Architecture · Authorization

Estimated field mix

  • API design50%
  • System design30%
  • Backend20%

Field percentages are editorial estimates of the ticket's engineering focus. They total 100%; they are not measured time, proficiency scores, or ownership evidence.

Your next step

Review it, then add it to your workspace.

The board opens an editable draft; nothing is saved until you confirm it. Sign-in and workspace permissions apply, and Demo boards remain ephemeral.

Project context

A fictional inventory platform must replace a legacy availability response. Existing partners upgrade on different schedules, and the team needs a versioned transition.

Setup prerequisites

  • Create two local API versions and synthetic partner clients with different upgrade schedules; no real partner traffic.

Preceding work

Complete these dependencies, or supply their agreed outputs before taking this ticket.

Acceptance criteria

  • Share domain availability calculation.
  • Map into distinct immutable transport schemas.
  • Preserve version-specific unknown-state semantics.

Implementation constraints

  • Controllers cannot bypass tenant-scoped service reads.

Verification to include

  • Project one domain result into both versions.
  • Deny cross-tenant reads through either route.

Deliverables

  • Versioned projection boundary.

Rollout and recovery

Ship the new projection alongside the old; retain identical domain invariants.

Value of the work

For the engineer: Practice public-contract design, compatible evolution, and client lifecycle management.

For the team: Provide a predictable migration that keeps supported integrations inspectable and recoverable.

Evidence boundaries

Outcome Evidence: Tests, patches, and runbooks are requested deliverables. They become Outcome Evidence only through a qualified Mission and immutable Evidence IDs.

Ownership Evidence: Independent adaptation must be observed under a declared verification policy and cite immutable Evidence IDs. Completing a planning ticket establishes no Ownership Evidence.